Hello fellows, Frankly, I borowed this idea from another platform but I found it's interesting, so I added some technical levels for DCA and exits. The stock were slammered by supply chain problems. Fortinutely, they do not have problems with demand of their products and services. Green lines are DCA levels. Red lines are good (in my opinion) levels for...
ITI: Iteris, Inc. 2019-12-12 08:30:00 Iteris Awarded $2 Million Contract to Provide Traffic Engineering Design Services for Los Angeles County Metropolitan Transportation Authority (Graphic: Business Wire)
ITI: iteris inc 2018-08-14 08:30:12 Detected possible contract awarded
ITI: iteris inc 2018-06-12 08:30:08 Detected possible contract awarded